Sign In | Join Free | My udpf.com |
|
Brand Name : ABD
Certification : CE
Place of Origin : Guangdong, China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, L/C
Supply Ability : 10 Sets per Month or more
Packaging Details : According to the customer's requirements
Running type : Full-automatic
Material : ALuminium Profiles
Condition : New brand
Applicable Industries : Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Warranty : 1 year
Heating power : Natural gas, LPG, diesel oil
Voltage : 480V 60Hz Customers Local Voltage
After-sales service provided : Engineers on hand to repair gear abroad
Marketing Type : Hot Product 2019
Key Selling Points : High Productivity
Type : Vertical
Manufacture Time Time : 4 months
Conveyor Speed : Adjustable
Style : box, tunnel, bridge oven
Vertical Powder Coating Line With Best Surface Treatment Equipment
This proposal is designed for aluminum profiles vertical powder coating line—One Booth
1. Design data
A, Coating Material : Aluminum Profile
B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .
C, coating profile specifications:
a,Max size of the profile : 100mm×200mm×L7000mm
b,Max Weight of the profile: 30KG
c,Standard weight : 3.5kg
d,Standard surface area of the profile : 400m2/T
2. Energy supply
A,Power supply
Single-phase voltage:220V+10%
Three-phase voltage:380V+10%
Frequency:50Hz
Equipment group line and zero line
B,Natural gas
3. compressed air
A,pressure : 7.0bar
B,Max steam flux: 1.3g/nm3
C,Max oil content: 0.01ppm
D,Max Flux of the compressed air: 8m3/min
4. Industrial water required
A,Pressure: 3+0.2bar
B,Flux:5m3/h
5. Powder
A,Powder characteristic : LEL≥40g/Nm3
6. Production Capacity
Conveying chain speed: 1.2m/minute
Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr
Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr
Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day
Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month
Feature:Automatic Vertical Powder Coating line for Aluminum Profile Surface Treatment Equipment.Save gas and Energy,save space.High quality,high productivity, smooth and durable coating.
Main Component:Powder coating Hanging conveyor system,Loading and unloading system,Pre-treatment,Drying oven,Powder coating chamber and recycle system,Curing oven,Electrical Control System,Powder Coating Guns,Powder Supply Center,Air compressor,DI Water machine system and so on.
Ordinary powder coating process:Unloading-Rinsing-Predegreasing-Degreasing-Rinsing-Rinsing-Pure Water-Passivation-Rinsing-Pure-Drying-Powder Coating-Curing-Unloading.
Vertical powder spraying operating procedures is as follows:
1,For profile powder spraying, pre-treatment is extremely important. A layer of natural oxide film is formed on the surface of the extruded profile with certain oil stains and sundries, which must be cleaned by chemical treatment before spraying.
2,Pre-processing processSkim ---【 1.5-5 minutes 】 ---washed 【0.5-1 minute 】--- washed 【0.5-1 minute 】--- acid surface adjustment 【1.5-5 minutes - --washed 【0.5-1 minute 】---washed 【 0.5-1 minute 】--- sharpen 【0.5-2 minutes 】--- washing【 0.5 --1 min 】-- Pure water wash 【1-- 2 min】.
3,Degreasing purpose:The purpose of degreasing treatment is to remove the oil stain on the surface of the profile and ensure the surface cleanliness when the profile enters the chroming tank.
4,Degreasing tank process parameters:During production, analyze the concentration of free acid tank liquid every two hours, adjust the tank liquid according to the analysis results, and clean the tank liquid surface from time to time without changing the tank liquid.
5,Acid Surface Conditioning Purpose:The main purpose of acid surface treatment is to further remove oil from the profile, so that the surface of the profile exposes a fresh matrix, so as to facilitate the smooth chroming reaction.Analyze the concentration of the bath solution every two hours and adjust according to the analysis results. Under normal circumstances, the bath liquid does not need to be replaced and can be used for a long time.
6,Purpose of chroming tank:It is very important for aluminum spray chroming tank. The surface of the chromed profile will form a light yellow chemical conversion coating. Weather rability of sprayed profiles.Analyze the abnormality of the bath liquid every two hours, and make adjustments according to the analysis results. Generally, the bath liquid is replaced every 2,000 tons of production, and the bath liquid is replenished from time to time.
7,The chromed profiles enter the drying furnace for surface drying. The drying temperature should be between 80 and 90 degrees, and should not exceed 95 degrees, otherwise the quality of the adhesion between the coating and the profiles will be affected.
8,The dried profiles enter the spray booth at a chain speed of 1—2.5/m for spraying(The chain speed is adjustable according to the needs of customer).
9,Through the cleaned and filtered air pressure [7-8 kg], the powder is evenly sprayed on the work pieces with the electrostatic powder gun; the electrostatic voltage of 45-90kw and the corresponding powder supply system and parameters to ensure that the coating reaches the set After the process requirements, the spraying process is completed.
10,After spraying, enter the curing furnace for leveling curing. The curing temperature is between [195-215 degrees], and the curing time should be between [15-25 minutes].
11,The profiles that have been cured and released are heated as a whole. Do not touch the surface of the profiles with bare hands. After cooling, they can be removed from the shelf. After removing the shelf, check the sprayed products. The surface must be smooth and the coating should be uniform. marks, orange peel, and other phenomena, and then can be packaged after passing professional quality inspection.
The company's production capacity and technical level have always been in a leading position in the same industry. Our products have obtained multiple national invention patents before and after, and also successfully passed CE certification in 2012. At the same time, high-quality products have also been recognized and awarded multiple honorary titles by the company in the industry, including high-tech enterprises, leading enterprises in Foshan High tech Zone in 2020, gazelle enterprises in Foshan National High tech Zone in 2019, leading enterprises in segmented industries in Foshan City, key recommended products in the aluminum processing industry in Sanshui District, Foshan City, excellent suppliers in 2019, and top 20 Chinese aluminum equipment brands, Foshan National High tech Zone's 2020 Manufacturing Singles Champion Enterprise, Specializing in Fine, Special, and New Small and Medium sized Enterprises, Innovative Small and Medium sized Enterprises in Guangdong Province, etc. The excellent quality and service make "Anbang Equipment" exported to more than 35 countries and regions in the world, including the United States, Australia, New Zealand, Vietnam, Malaysia, Indonesia, Sri Lanka, the United Arab Emirates, Saudi Arabia, Qatar, Kuwait, Türkiye, Egypt, Algeria, Angola, Mexico, Colombia, etc.
FAQ
1. What should we provide if interested in your equipment ?
A. The material/size(max)/weight(max)of your workpieces.
B. What is the expected output of this equipment (8 hours/day,or 30 days/per month )?
C. The available workshop space which you plan to place this set of equipment(in LxWxH) ?
D. What fuel do you prefer to use for heating system:Electric,Gas,LPG,Diesel or others?
2. How to install equipment after purchasing your equipment ?
A. We will provide installation documents ,3D assembling drawing or installation video to guide the installation work.
B. Our engineer will guide the equipment's installation and debugging on line.
C. We can arrange installers to your factory to guide the installation work if needed,this service is chargeable.
D. After the debugging, will provide complete training and track the equipment's usage regularly.
3. How is your company's after-sales service done?
A. 1 year parts warranty, parts mainly include fans,burners,electric components of control cabinet,metal structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical support will always be online
Hope our warm company can meet friendly you and bring you a different experience.
ABD LPG Heating System Famous Brand Burner Vertical Powder Coating Line of Aluminium Alloy Profile Customized Voltage Images |